BlueCielo Meridian REFSYS 2012 Configuration Guide | BlueCielo ECM Solutions

You are here: About configuring Meridian > Document type groups > Plant group revision numbers

Plant group revision numbers

The settings that control the revision numbers of documents in the Plant group are described in the following table.

Plant group revision number settings

Setting

Default

Description

REVISION_INITIAL

Initial revision (not used).

REVISION_LEVEL1_FIRST

0

Scheme for the first level revision (master document).

REVISION_LEVEL2_FIRST

A

Scheme for the second level revision (project copy).

REVISION_LEVEL3_FIRST

R1

Scheme for the third level revision (sub-project).

REVISION_NUMLEN

2

The length of the plant revision number.

REVISION_INCREMENTONPROJECTCOPY

false

True increments the revision number when a document is added to a project. False increments it when the document is released from a project.

REVISION_SEPARATOR

.

Characters used to separate the revision number elements.

Major revision numbering is used when a document is released as a master document revision. Minor revision numbering is used for revisions within a project.

The result of configuring the revision number as shown in the preceding table is:

Related concepts

Document type groups

Generic group workflow

Generic group filenames

Project group workflow

Retention rules

Sequence numbers


Copyright © 2000-2012 BlueCielo ECM Solutions

www.bluecieloecm.com