|
|
|
BlueCielo Meridian Advanced Project Workflow Module 2012 Configuration Guide | BlueCielo ECM Solutions |
Returns the expected result of executing the specified project workflow transition for the current folder object.
GetExpectedTransitionResult(Transition As IASWorkflowTransition) As AS_WORKFLOW_TRANS_RES
Name | Description |
---|---|
Transition |
An object that represents the project workflow transition to run. |
Returns a long integer that is equivalent to one or more of the AS_WORKFLOW_TRANS_RES constants that represents the expected results. Use this method to determine the current consensus status of parallel workflows.
Copyright © 2000-2012 BlueCielo ECM Solutions |