A special link for AutoCAD P&ID can be configured to load in AutoCAD P&ID as described in the BlueCielo Meridian Asset Management Module Administrator's Guide. It makes additional commands available to you besides those in the base AutoCAD P&ID link. The synchronization commands are designed to work specifically with the tags created by AutoCAD P&ID when they are linked to tag tags in the Asset Management Module.
Command | Description |
---|---|
Folder Structure |
Creates missing sub-folders in the (local or shared) workspace location to match the folder structure of the project in the vault. |
Tags Dialog |
Opens the Tags dialog box so that you can view the status of the drawing tags as described in Viewing asset tags. |
Update Drawing |
Synchronizes the tags in the drawing from the corresponding asset tags in the vault. The tag properties must be mapped to Meridian Enterprise properties by a system administrator. |
Update Vault |
Synchronizes the asset tags in the vault from the corresponding tags in the drawing. The tag properties must be mapped to Meridian Enterprise properties by a system administrator. |